subframe base testing

TEST REPORTS

TopHat has performed numerous engineering tests to assist you or your engineer with the design of your project and to prove the reliability of TopHat systems. Please contact us if you need project-specific engineering guidance.

Always consult with a professional engineer registered in the state of your project before you start any project.

TopHat Subframe Base Testing

No Details PDF
1 16 ga. TopHat Gravity Test Pdf_icon
2 16 ga. TopHat Uplift Test Pdf_icon
3 16 ga. Continuous TopHat Uplift Test Pdf_icon
4 16 ga. High Strength TopHat Uplift Test Pdf_icon
5 14 ga. TopHat Uplift Test Pdf_icon

TopHat US200DL System

TopHat between Purlins, 2'-6" spacing

No Details PDF
1 22 ga. US200DL – 16" wide Pdf_icon
2 22 ga. US200DL – 18" wide Pdf_icon
3 24 ga. US200DL – 16" wide Pdf_icon
4 24 ga. US200DL – 18" wide Pdf_icon

US200DL Test Reports

No Details PDF
1 22 ga. US200DL – 12" wide, 2'-6" spacing Pdf_icon
2 22 ga. US200DL – 12" wide, 5'-0" spacing Pdf_icon
3 22 ga. US200DL – 16" wide, 2'-6" and 5'-0" spacing Pdf_icon
4 22 ga. US200DL – 18" wide, 2'-6" spacing Pdf_icon
5 22 ga. US200DL – 18" wide, 5'-0" spacing Pdf_icon
6 24 ga. US200DL – 16" wide, 2'-6" spacing Pdf_icon
7 24 ga. US200DL – 16" wide, 5'-0" spacing Pdf_icon
8 24 ga. US200DL – 18" wide, 1'-0" and 5'-0" spacing Pdf_icon

Other TopHat Test Reports

No Details PDF
1 26 ga. R-Panel, 2'-6" spacing #1 Pdf_icon
2 26 ga. R-Panel, 2'-6" spacing #2 Pdf_icon

US175LS Test Data

No Details PDF
1 22 ga. US175LS – 12" wide, 1'-0" spacing Pdf_icon
2 22 ga. US175LS – 12" wide, 6'-0" spacing Pdf_icon
3 24 ga. US175LS – 16" wide, 1'-0" and 5'-0" spacing Pdf_icon